An external overflow pipe connects the absorber reaction tank to the box.
外部溢流管把吸收塔反应箱和密封箱连接起来。
The place of dosing is arranged between an inlet to an overflow pipe (5) and an inlet to the toilet bowl.
所述定量供应位置设置在溢流管(5)入口和马桶底座入口之间。
Because the gap of the overflow pipe and the bathtub is too small, they can not be assembled together according to the manual.
由于溢水管与浴缸间隙太小,不能按照说明书进行组装。
应用推荐